Modernization of the heat source and installation of solar collectors for the Hospital in Bochnia

Modernization of the heat source and installation of solar collectors for the Hospital in Bochnia
Contract:
Modernization of the heat source and installation of solar collectors for the Hospital in Bochnia
Date of implementation:
2011.06 2012.04
Volume m3:
3,6
Surface m2:
636
Branch:
Rzeszów
Segment:
Hospitals

Works scope

Building permit design delivered by Customer. Works executed by Erbud as General Contractor. Construction of technological systems connecting units supplied under the contract (cogeneration unit, gas boilers, solar collectors, absorption generator for production of chilled water, power generator), incl. installation of necessary equipment, and electrical, control and measurement systems. Installation of internal wiring of heat and electricity cogeneration system. Installation of the solar system with automatic control.