Reconstruction, renovation and change of use of the building at ul. Stefana Czarnieckiego 3 in Krakow

Reconstruction, renovation and change of use of the building at ul. Stefana Czarnieckiego 3 in Krakow
- No picture  -
Contract:
Reconstruction, renovation and change of use of the building at ul. Stefana Czarnieckiego 3 in Krakow
Investor:
INSTITUTE OF NATIONAL REMEMBRANCE – Commission for the Prosecution of Crimes against the Polish Nation
Date of implementation:
02.2022 - 07.2024
Volume m3:
14 800
Surface m2:
4260
Branch:
Rzeszów
Segment:
Public utilities

Works scope

Reconstruction, renovation and change in the use of the building of the former Detention Suite at ul. Stefana Czarnieckiego 3 in Kraków for office purposes as the new seat of the Institute of National Remembrance, Kraków Branch. The construction works include adaptation of the attic, construction of a lift shaft, construction of an external goods lift, reconstruction and expansion of internal water, central heating, sanitary sewage systems:, construction of ventilation and air conditioning, standard and low-voltage electrical systems inside and outside the building, construction of area lighting, reconstruction and expansion of the rainwater sewage system, along with the renovation of the hardened surface of the area, street furniture, construction of a waste collection site, construction of an underground structure for technical devices.

Share implementation: