WFGD installation for steam boilers and hot water boiler

WFGD installation for steam boilers and hot water boiler
Contract:
Construction of foundations, utilities connections, alterations and relocation of plant and water supply and drainage systems for WFGD installation of steam boilers OP-380, OP-430, K1, K2, K3, K4 and hot water boiler WP-120 KW4 / KW6, in the companies of EDF Polska Group for EDF Krakow SA, 1 Ciepłownicza St., Kraków
Date of implementation:
2013.07 - 2014.09
Branch:
Katowice
Segment:
Power industry

Works scope

Construction of foundations, incl. earthwork and ground improvement for: 1. Absorber with support frame for a new emitting device, 2. Plant building, 3. ID fan, 4. Process water pumping and absorber emergency discharge station, 5. Process water tank, 6. Emergency discharge tank, 7. Sorbent storage and dissolution facility, 8. Staircase and lift shaft, 9. Sorbent receiving and gypsum loading station, 10. Electricity switching station 11. Gypsum dewatering and compressor station, 12. Gypsum storage building, 13. Wastewater treatment facility, 14. Pipe and cable bridge, 15. Elevated gypsum conveyor, 16. Truck scale, 17. Centrifuge circulation tank, 18. Flue gas ducting foundation. Relocation of on-site systems: heating piping, fire water, compressed air, water supply and sewerage and process network.

Share implementation: