Building and engineering works, including plant and equipment, under the project “New heat and power plant in the Azoty Group - Zakłady Azotowe Kędzierzyn SA”

Building and engineering works, including plant and equipment, under the project “New heat and power plant in the Azoty Group - Zakłady Azotowe Kędzierzyn SA”
Contract:
Building and engineering works, including plant and equipment, under the project “New heat and power plant in the Azoty Group - Zakłady Azotowe Kędzierzyn SA”
Investor:
Grupa Azoty Zakłady Azotowe Kędzierzyn S.A. ul. Mostowa 30 A; 47-220 Kędzierzyn-Koźle
Date of implementation:
2014.06-2016.10
Branch:
Katowice
Segment:
Power industry

Works scope

The contract scope for ERBUD SA includes: 1) Construction and finishing works (excluding building systems): - main building with stair-tower - control house - oil pump house - pump house with distribution room - compressor house - cooling towers - FGD plant (footing) - fuel oil tank (footing) - ash tank (footing) - desulphurisation product tank (footing) - sorbent tank (footing) - ammonia solution tank (footing) - electricity equipment house, incl. stair-tower - elevated conveyor for slag (footing) - slag dump - site development works. 2) Comprehensive design and installation of the coal handling plant on a turnkey basis (incl. design, construction, technique and systems). 3) Installation of the condensing-extraction turbine generator.